CK168 error generally occurs at main materials due to the issues in raw
material or semi-finished goods of lower level.
Check the material types of all the lower level materials from BOM of
material xxxxx. If the lower level material is external procured “F”, then
planned prices could be missing or with invalid date. To resolve the issue for
“F” material check the valuation strategy of costing variant, see the
priorities maintained for calculating the material cost, like Planned Price
1/2/3 etc and then validate in the material master data whether a proper price is
maintained or not. Always keep in mind that the date of planned price should
always be equal or less than the costing run date.
If the materials are in-house produced materials
then check whether any activity price is missing or not or the issue can be
because of Bill of materials.
Need the cost estimation for concrete batching plant! Please mail me the details.